Today Jon arrived at 2, sanded down the rough spots on the subfloor in preparation for putting down tile underlayment, and left for a 3 o’clock appointment.
The sheetrock guys postponed starting until tomorrow.
broken-link-checker
domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init
action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /usr/home/erinvanggp/public_html/erinvang/wp-includes/functions.php on line 6114Today Jon arrived at 2, sanded down the rough spots on the subfloor in preparation for putting down tile underlayment, and left for a 3 o’clock appointment.
The sheetrock guys postponed starting until tomorrow.